You are not logged in.

1

Sunday, June 20th 2021, 2:49pm

go next pano after n sec.

Hi,

I have a tour with two panos and I need a 20 sec. delay on the first pano which triggers the second but on the second the timer should be off.



thanks in advance for the reply

Posts: 141

Location: Russia, Komi republic, Uhta

Occupation: developer

  • Send private message

2

Monday, June 21st 2021, 7:26pm

Add delayedcall to the onstart parameter of the first scene. then the second will load after the specified time. though it will be necessary to clear this parameter after switching to the second scene, so that it does not switch over again)

Hello from uhta3d )))
I'm in telegram: Lastromantik